Installation & Commissioning
After discovery and engineering, field implementation is the critical step that defines performance. Fertima manages every stage of installation under one plan.
Mechanical, electrical, and automation integrations are tested on site; the project is commissioned in working condition with clear acceptance criteria.
-
01
Site preparation
Schedule, logistics, and safety plan are clarified.
-
02
Mechanical & electrical installation
Equipment and infrastructure are installed per plan.
-
03
Automation integration
Sensors, controllers, and software are tested.
-
04
Commissioning & acceptance
Function tests and acceptance criteria are completed.
The plan becomes a field standard
The installation process follows clear control steps to ensure accurate implementation of the design and risk management.
- Site preparation, logistics, and safety plan.
- Mechanical assembly, electrical panels, and field connections.
- Sensor points, wiring, and communication tests.
- Function tests and commissioning checklist.
Working system and clear acceptance criteria
The deliverable package at commissioning is short and clear.
Working system in the field
Mechanical, electrical, and automation layers are validated on site.
- Function tests are completed.
- Scenario validation records are captured.
Acceptance and test report
Commissioning steps are documented.
- Checklists and measurement logs.
- Implementation revisions and field notes.
Stable operations plan
Monitoring and improvement plans are prepared for the first days.
- First-week follow-up plan.
- Deviation and risk management.